CZPT reducing metal sq. pipe forming machineÂ
Â
Hollow Xihu (West Lake) Dis. Rail Generation Line Title:Hollow Xihu (West Lake) Dis. Rail Generation Line Product:YX Collection Hollow guidebook rail creation line is designed for making numerous elevator hollow manual rails with the wall thickness 2.3mm-three.2mm. We can also provide the CZPT devices.
We can also source the CZPT machines.
Functions of Hollow Xihu (West Lake) Dis. Rail Generation Line
Hollow manual rail production line is developed for making different elevator hollow guidebook rails with the wall thickness two.3mm-three.2mm. This new sort creating line has positive aspects like higher precision, high processing speed. Its processing velocity can be occasions of traditional a single.
Purposes of Hollow Xihu (West Lake) Dis. Rail Production Line
The finished products are broadly utilized in elevator, and many others.
Approach Flow of Hollow Xihu (West Lake) Dis. Rail Creation Line
Uncoiler —- Shear & Butt Welder —- Accumulator —- Leveling —- Roll Forming — CZPT Cutting — Operate Out Table
Machine Configurations of Hollow Xihu (West Lake) Dis. Rail Creation Line
one. CZPT CZPT Uncoiler | 2. Shear & Butt Welder |
3. Horizontal Accumulator | four. Leveling |
5. Roll Forming Machine | six. CZPT Reducing System |
7. Run Out Desk | Â |
Â
two profile in 1 roll forming device | |||
Title | Amount | Units | |
Decoiler | one | Set | |
Main Machine | Feeding gadget | 1 | Established |
Roll forming method | 1 | Set | |
Lower Equipment | 1 | Established | |
CZPT system | one | Set | |
CZPT control method | one | Set | |
Supporter/Automated Stacker | 1 | Established |
We can also source the CZPT machines.
CZPT Data:
1. Manual Decoiler
  Decoiler Type: Manual Decoiler
  Bodyweight Ability Of Decoiler: 3 Ton
   Inner Diameter. Φ460-520mm
   Outer Diameter. Φ1400mm
2. Roll Forming systemÂ
  Axis Diameter:sixty mm
  Forming Roller stand: 10-12Groups
  Major Axis material: First quality forty five# steel, heated and quenched
  Roller content: First quality 45# steel, with hard chrome .05mm, Quenched and heated process
  Drive Type: one” Chain of transmission
  Chain materials: forty five#steel, HRC45-fifty
  Equipment Frame stand: Welded structural metal
  Principal motor Energy: 5.5 KW Â
three. Cutting Gadget (consist of two dimension)
  Reducing sort: CZPT cuttingÂ
  CZPT pump station electrical power: 4 KW
  CZPT stress: 12Mpa
  CZPT Blade and cutter substance: Cr12, quenching method fifty eight-sixty two
  Cutting duration tolerance: 10M+/- two. mm
4. CZPTal Program
  Voltage: 380V, 3 Stage 50Hz
  PLC CZPTal control program: PANASONIC
  Size Controller: Encoder Frequency Manage System
  Operation: Touch Display
  Transducer: Japan YASKAWA
five. Runout Desk:
  Non-electricity type
  Quantity:two
2 profile in one roll forming machine Drawing:
deal and Guarantee:
one.Nude,with waterproof cloth and stow-wood.CZPTed pc handle method packed with waterproof cloth and card board.
two.This generating line is managed cost-free of cost for eighteen months.When the equipment is used in China,we will install and debug the machine for freeif it is utilized at abroad,we will deliver the specialist technician to debug.Customers need to take all the costs for specialists travelling overseas.
3.All the parts in the roll forming machine is totally free to keep all the existence,if in 18 months our organization bear the cost for exchanged the damaged component like the new components expense and categorical value,if a lot more than eighteen thirty day period,we also free of charge to sustain the damaged parts but for send the new areas,the purchaser need to have bear the express expense.
four.When ship the roll forming device,We will also ship one established CD and specification(Chinese and English) to you with the equipment,they can educate you how to operater the machines.
FAQ:
Q:What is your Guarantee ?
12 months, during which all elements broken because of good quality difficulty will be changed for free of charge.
Q: What’s your shipping Time ?
Within forty five-sixty times right after receiving prepaid. Some machines in inventory, can be delivered at any time.
Q: What is actually your payment phrases ?
thirty% deposit is compensated prior to manufacturing, the balance compensated after inspection affirmation prior to cargo.
Q:What’s your Set up and Instruction ?
If customers appear to our manufacturing unit to examine, the education to install and work is offered face to encounter.
If not, manual and movie is provided to show how to set up and work.
Q: What is you after-sale provider ?
We give 24-hour on the internet service for our consumers.
A.The vendor will debug the equipment freely in China, and the traffic price in China of the method folks will be paid out by the seller.
When technique guys go to the buyer’s area to debug the equipment, the consumer need to shell out the expenditure of accommodation, and site visitors for the buyer’s males.
B. If the consumer sends individuals to obtain the education of the operation provided by the vendor, in the course of the training period, the seller must pay out the cost of accommodation, and visitors for the buyer’s males.
Q: How to place purchase ?
Inquiry—affirm the profile drawings and cost—-affirm the PI—set up the deposit or L/C—then Ok
Q: How to check out our firm ?
Fly to ZheJiang airport: By high velocity practice From ZheJiang to HangCZPT (30 min),then we can decide up you.
Â